A method built to end, not to renew itself.
Most consultancies are structured to extend the engagement. This one is structured to finish it — and the process below is designed around that, from the first diagnosis to the deliberate handover.
Six phases, twelve weeks, one handover
Timelines shift with scope — these are indicative, not promises. What does not shift is the shape: diagnose before scoping, demonstrate before integrating, transfer before leaving.
Diagnose
We spend the first weeks understanding what actually happens, not what the process documentation says happens. That means sitting with the people doing the work. Almost every engagement uncovers a constraint that was not in the original brief.
Weeks 1–2Scope
A written scope with a defined outcome, a fixed set of deliverables, and an explicit list of what we are not doing. If we think the timeline is unrealistic, you hear it here — before the contract, not during the retrospective.
Weeks 2–3Build
Engineering in short cycles with something demonstrable at the end of each. You see working software, not status decks. The team that scoped the work is the team building it.
Weeks 3–8Integrate
Connection into your live systems, with rollback paths and a staged rollout. This is where most AI projects stall, so we plan for it from day one rather than treating it as a final step.
Weeks 6–10Transfer
Documentation, training, and a defined period where your team runs the system with us on call. The engagement is not finished until they can run it without us.
Weeks 9–12Sustain
Optional ongoing operations while your team builds capability — with an agreed runway toward you taking it over entirely. Permanent dependency is not the business model.
OngoingFour positions we will not negotiate
We don't do it for you. We clear the way.
A rocket booster does not fly alone. A signal booster generates no signal. We attach to the mass you already have — your people, data, processes, market position — and make it go further than it could by itself.
No handoff between sellers and builders
The people in the room during scoping are the people writing the code. The industry standard of senior partners selling and junior staff delivering is where most of the disappointment in this sector comes from.
Honest timelines, stated early
If your deadline is not achievable we say so before the contract is signed. It costs us work in the short term and saves both sides a failed programme in the long term.
The engagement is designed to end
Success is your team running the system without us. We would rather be recommended than retained indefinitely, and the commercial model is built that way on purpose.